Curriculum Vitae |
 |
Snežana Mijailović
Electricity Coordinating Center
Vojvode Stepe 412
Belgrade, Serbia
Position: Deputy General Manager
Year of Birth: 1965
Place of Birth: Pancevo, Serbia |
| |
SUMMARY OF QUALIFICATION |
| 2005 |
Master Science degree of Electrical Engineering - M.Sc.E.E.
Faculty of Technical Science, University of NOVI SAD, SERBIA |
| 1990 |
Graduate Electrical Engineer
Faculty of Electrical Engineering, University of BELGRADE, SERBIA |
| |
FURTHER TRAINING |
| 2002 |
PSS/E Training Course for Load Flow and Dynamic Simulations, held by Simens-PTI |
| |
KEY QUALIFICATION |
| |
- Planning and control of power systems (mathematical and numerical modelling and practical application)
- Connection of electric power systems in large interconnections
- Research studies and computer programs in area of electric power system
- Profound knowledge of electricity sector in South Eastern European countries
- Technical analysis of electricity sector projects and developments
- Management of teams and consulting projects involving international partners.
- Achievement of planning studies for transmission and distribution network
- Electricity consumption and peak load forecast
|
| |
SPECIAL SKILLS |
| |
- Languages
- English (excellent)
- German (good)
- Professional software
- PTI PSS/E (load flow, fault analyses, dynamic analyses, motor starting etc)
- Power System Analyzer (load flow, network transfer capacities evaluation)
- Microsoft Office Applications (Word, Excel, Power point)
- Management tools (Microsoft Project)
- Programming (Fortran)
|
| |
MEMBERSHIP |
| |
- Member of UCTE System study SG
- Member of SUDEL Enlarged Committee
- Member of SETSO TF
- Co-convener of SETSO NACMPF SG (Network Access, Congestion Management and Power Flow SG)
- Member of ETSO NACM SG
- Member of the UCTE-IPS/UPS Workgroup
- Member of SECI - The Southeast European Cooperative Initiative
- Member of Black Sea Regional Workgroup
- Member of Central Asia regional Working Group
|
| |
PROFESSIONAL EXPERIENCE |
| 2002 – to date |
Deputy General Manager
Electricity Coordinating Center Ltd. |
| 1997 – 2002 |
Head of Research and Consulting Department
Electricity Coordinating Center Ltd. |
| 1990 –1997 |
Engineer
Institute "Nikola Tesla", Belgrade - Electric Power System Department |
| |
SELECTED REFERENCES |
| U toku |
Technical parameters Calculation software for 2009/2010 SEE Dry-run of Coordinated flow-based Auctions
Team member, for: KfW bank (Germany)
|
| 2009 |
Generation surplus projections in Eastern Europe (EE) region and electricity market scenarios in the period 2008 – 2020, [Updated data and scenarios]
Consultant, for: TERNA, Italy
CAO - Freising - IT system for coordinated flow based allocation and related services
EKC: Technical Parameters Calculation PTDF/MF
Team member , for: Riecado (Siemens, CEE CAO Freising/Munich, Germany)
Connection of the TPP Porto Romano to the EPS of Albania
Project leader, for: RWE, Germany |
| 2008 |
PSA_maxFlow: Software for processing of technical data, (network models, PTDF matrices and transmission capacities), within the 2008 - DRY-RUN implementation of Coordinated Auctions in SEE region
Project Contract Manager, for: USAID and SEE TSOs
Review of electricity supply, demand and transmission projections in South-east Europe in the period 2008-2020
Project leader, for: CEZ, Czech Republic |
| 2007 |
Connection of new (second) block in TPP Gacko to power system of Bosnia&Herzegovina
Team member, for: CEZ, Cech Republic
Black sea Regional Transmission Planning Project, Regional model for 2010. year update and Network capacities evaluation
Task Leader, done for USAID |
| 2006 |
Technical Study for the synchronous parallel Operation of the Turkish Power System with UCTE
Team member, for: CFCU Turkey, UCTE
Feasibility Study: Synchronous Interconnection of the Power Systems of IPS/UPS with UCTE
Team member, for: EU, CIS
BSR Transmission System planning project, Regional model construction for 2010
Team member, for: USAID, USEA |
| 2005 |
Regional Balkans Infrastructure Study REBIS – Generation Investment Study GIS, Appendix 12: PSS/E ANALYSES AND RESULTS
Team member, for: European Comission, World Bank |
| 2004 |
Technical and economical aspects of connection electric power systems between Serbia and Macedonia with new transmission line 400 kV Niš-(Leskovac-Vranje)-Skopje.
Project leader, for: EPS – Electric company of Serbia
Effects of connecting power systems of Republic of Srpska and Serbia with new 400kV line Ugljevik - S.Mitrovica after reconnection first and second UCTE zone
Project leader, for: EPS – Electric company of Serbia, Elektroprenos - Banja Luka
Evaluation of transfer capabilities in Balkan interconnected network
Technical Report, Research Project
Joint Greek-Yugoslav Research Cooperation, Funded by: General Secretariat for Research and Technology, Greece, 2004, EKC, HTSO-GREECE, NTUA-GREECE (in English)
Effects of implementation of the ETSO CBT mechanism in process of accounting and evaluation of expenses in international electric energy exchanges
Project Manager (in Serbian), done for Electric Power Utility of Serbia |
| 2003 |
SECI Regional Transmission Planning Project, Regional model construction for 2005. (updating and expanding existing Regional Transmission Network Model for the year 2005 ) and 2010.
Project task leader, for: SECI
Study for new 400 kV interconnection lines between FYROM - Serbia and Albania - Montenegro
Team member, for: SECI
Study of electric power and energy losses in transmission network of power utility of Montenegro (EPCG) with measurements for their reduction
Project leader, for: EPCG
Review of Electricity Supply and Demand in South Eastern Europe (2002 - 2012),
Project leader, for: World Bank
Review of Electricity Supply and Demand in South Eastern Europe, Final Report
Consultant on internal project, done for World bank, (in English)
Technical and economical aspect of connection of electric power systems of Serbia and Macedonia through 400 kV line Niš-Leskovac-(Vranje)-Skoplje
Project Manager, done for Electric Power Utility of Serbia (in Serbian, summary in English)
Feasibility study for installation of the new Hydro Power Stations Buk Bijela and Srbinje (Foca) in the power system
Consultant, done for Electric Power Utility of Republic Srpska, (in Serbian)
Study of electric power and energy losses in transmission network of power utility of Montenegro (EPCG) with measurements for their reduction
Project Manager, done for Electric Power utility of Montenegro (in Serbian)
Project SECI project group on development of interconnection of electric power systems of SECI countries for better integration to the European system
Regional Transmission Planning Project, ESM, EKC, NEK, EPBiH, Institute Hrvoje Pozar, done for SECI-USAID (in English) |
| 2002 |
SECI Regional Transmission Planning Project, Regional model construction 2005
Project task leader, for: SECI
Project SECI project group on development of interconnection of electric power systems of SECI countries for better integration to the European system,
- Regional Transmission Planning Project
Effects of construction of new tie lines candidates in SECI countries.
Team member, for: SECI
Preliminary design for solution of electric energy supply of the Trebinje area,
Project leader, for: ERS
Feasibility study for installation of the new Hydro Power Stations Buk Bijela and Srbinje (Foca) in the power system
Team member , for: Electric company of Republic of Srpska
Feasibility and Evaluation Study of Electricity Interconnection of Turkey with Balkan Pool and UCTE - Steady-state and transient stability analysis,
Project leader, for: EU DG TREN
Preliminary design for solution of electric energy supply of the Trebinje area
Project Manager, done for Electric Power Utility of Republic Srpska (in Serbian) |
| 2001 |
Feasibility analysis of parallel operation of power transformers 110/35 kV/kV in RP Trebinje with preliminary design of 35 kV transformer bay
Team member, for: ERS - Electric company of Republic of Srpska
Feasibility and Evaluation Study of Electricity Interconnection of Turkey with Balkan Pool and UCTE
Project Manager of EKC team, HTSO, EKC, NEK, TEASH, done for European Union, (in English) |
| 1998 |
Upgrading at 400 kV of the existing 150 kV, Feasibility and evaluation study of upgrading at 400 kV of the existing 150 kV interconnection line Amynteo – Bitola Project Manager of EKC team, HTSO, EKC, NEK, done for European Union, (in English) New interconnection Greece - Bulgaria, Part A, Feasibility and evaluation study of a new interconnection line Filippi - Plovdiv or Filippi - Maritsa East 3
Project Manager of EKC team, HTSO, EKC, NEK, done for European Union, (in English
)Study on the effects of the new 400 kV interconnection line S.Mitrovica – Ugljevik, between Serbia and Republic Srpska
Project Manager, done for Electric Power Utility of Serbia, (in Serbian) |
| 1997 |
Possibilities and limitations for power supply from the region of East Herzegovina Project Manager, done for Electric Power Utility of Republic Srpska, (in Serbian) |
| 1996 |
Reconnection of the UCPTE Network and Parallel operation of the Bulgarian and Romanian networks with UCPTE PPC, EKC, ENEL, done for SUDEL (in English) |
| 1995 |
Choice of optimal variant of network 400 kV, 220 kV, 110 kV and 35 kV development in the area of Electric Distribution Niš, Leskovac and Vranje
Institute "Nikola Tesla" Beograd, done for Electric Power Utility of Serbia, 250 pages, 1995 (in Serbian)
Choice of electro-mechanical parameters of electric power units in HPP Dabar, Nevesinje and Bileća
Institute "Nikola Tesla", Beograd, done for Electric Power Utility of Republic Srpska, (in Serbian)
Feasibility study for installation of the new Hydro Power Stations (Dabar, Nevesinje and Bileca) in the Regional Power System of East Herzegovina
Project Manager, Electricity Coordinating Center and Nikola Tesla Institute, 1995, done for Electric Power Utility of Republic Srpska, (in Serbian)
Technical Feasibility Study of Interconnection of the Electric Power systems of Bulgaria (NEK) and Romania (RENEL) with the interconnected Power Systems of Greece (PPC), Power Systems under EKC coordination and Albania (KESH) for Parallel and synchronous Operation in compliance with UCPTE regulations and standards, Part IV: Dynamic calculations for the year 1995
Nikola Tesla Institute, Beograd, 1995, done for Electric Power Utility of Serbia (in English) |
| 1994 |
Techno – economic analysis of placement providing of electrical energy and power from HPP HE Višegrad
Institute "Nikola Tesla", Beograd, done for Electric Power Utility of Republic Srpska, 219 pages, 1994 (in Serbian)
Technical and energy aspects of parallel synchronous operation of the Romanian electric power system RENEL within the European electric power systems interconnection UCPTE, Part IIb: Load - flow and steady - state security analysis for the year 1995", Part IV: Transient stability and primary frequency control analysis for the year 1995
Nikola Tesla Institute, Beograd, 1994, done for Electric Power Utility of Serbia (in English) |
| 1993 |
Project of prospective development of electric network 110 and 35 kV on suburban (and partly urban) area of electric distribution Belgrade till year 2010
Institute "Nikola Tesla" Beograd, done for Electric Distribution of Belgrade and Electric Power Utility of Serbia, 235 pages, 1993 (in Serbian)
Development of expert system for electric power system of Serbia – Data base for planning and exploitation of transmission network 400, 220 and 110 kV
Institute "Nikola Tesla", project done for Technology development fund for Ministry for science and technology Republic of Serbia, 72 pages, 1993 (in Serbian)
Analysis of possibilities for power supply the area of Republic Srpska and some parts of Republic Srpska Krajina (Bosanska Krajina - Semberija)
Institute "Nikola Tesla", done for Electric Power Utility of Republic Srpska, 77 pages, 1993 (in Serbian)
Possibilities and limitations for power supply from the region of East Herzegovina
Project Manager, Electricity Coordinating Center, 1993, done for Electric Power Utility of Republic Srpska, 66 pages, (in Serbian) |
| 1992 |
Technical and energy aspects of parallel synchronous operation of the Bulgarian electric power system with the Yugoslav electric power system JUGEL and Greek power system within European electric power systems interconnection UCPTE, Part I: Load - flow and steady - state security analysis", Part II: Steady state and dynamic stability of interconnection, Part III: Primary frequency control analysis
Nikola Tesla Institute, Beograd, 1992, done for Electric Power Utility of Serbia, 108 pages (in English)
Technical aspects of interconnecting the electrical power system of Macedonia and Albania at the 110, 220 and 400 kV voltage level
Nikola Tesla Institute, Beograd, 1992, done for Electric Power Utility of Macedonia and Albania, 315 pages (in Serbian)
Analysis of the possibility of electrical energy transit from the Interconnective power system of South Slav Republics - JUGEL, through the Hungarian power system, into the European electrical energy interconnection UCPTE and vice versa
Nikola Tesla Institute, Beograd, 1992, done for JUGEL, 408 pages (in Serbian)
Analysis of electric network in RTB Bor in order to enable maintenance rationing and exploitation in network development
Institute "Nikola Tesla", Beograd, done for RTB Bor, Beograd, 198 pages, 1992 (in Serbian) |
| 1991 |
Study of Yugoslav transmission network development till year 2000 in respect to year 2010 Electric Institute, Zagreb, Institute "Milan Vidmar", Ljubljana, Institute "Nikola Tesla", Beograd, done for JUGEL, 256 pages, 1991 (in Serbian) |
| |
|
|
... back to list of our experts |
|
|
 |
|
|