Feasibility study for installation of the new Hydro Power Stations Buk Bijela and Srbinje (Foca) in the power system
for: Elektroprivreda Republike Srpske
type: internal study
tools: PTI PSS/E
team: M. Vuković – project leader, S. Mijailović – consultant, N. Rusanov (NOS), P. Mikša, Z. Nešovanović, S. Marković, M. Apostolović |
|
Objective of this study is to give solution how to connect new HPP Buk Bijela and HPP Srbinje to transmission grid of Bosnia and Herzegovina, to enable reliable and secure evacuation of power from this site. Thorough examination of all possible critical states in network of Bosnia and Herzegovina has been performed, both from static and dynamic stability point of view. Technical values for selection of equipment have been given, for tendering purposes.
The following studies have been performed:
· Load flow and voltage profile analyses (steady state, contingency…)
· Fault analyses
· Static and Transient stability analyses
· Maximum exchange capabilities
|
Back to Top |
|
|
Study of Electric Power and Energy Losses in Transmission Network of Power Utility of Montenegro (EPCG) with Measurements for Their Reduction
for: Elektroprivreda Crne Gore - EPCG
type: internal study
tools: PTI PSS/E, PSA, home made special software
team: M. Vuković – project leader, S. Mijailović – consultant, P. Mikša, Z. Nešovanović, S. Marković |
|
Objective of this study is to evaluate power losses in transmission network of Montenegro and to propose measures for their reduction. In order to calculate power losses deterministic methodology was used (load flow calculations) based on real time recorded data. Within the scope of the study was also to evaluate measurement devices installed in Montenegro network, weather they have sufficient accuracy for electric energy metering. Home made special software tool was developed in order to calculate power losses in real time practice and to compare it with measurements. Influence of different production patterns, exchange scenarios and transmission network development scenarios on level of power losses was examined too.
The following studies have been performed:
· Load flow and voltage profile analyses (steady state, contingency…)
· Power losses calculations and analyses
· Development plan analyses
|
Back to Top |
|
|
|
Report of UCTE Executive Team "North-South Re-Synchronization", Load-flow analyses
for: Technical committee UCTE
type: analysis
finishing date: 2003
|
|
|
Back to Top |
|
|
|
SECI Project Group on Development of Interconnection of Electric Power Systems of SECI Countries for Better Integration to the European System,
Regional Transmission Planning Project,
Regional model construction
for: USAID, SECI
type: study
finishing date: 2002 |
|
|
Back to Top |
|
|
|
SECI Project Group on Development of Interconnection of Electric Power Systems of SECI Countries for Better Integration to the European System,
Regional Transmission Planning Project,
Prioritization of planed power lines
for: USAID, SECI
type: study
finishing date: 2002 |
|
|
Back to Top |
|
|
|
Feasibility and Evaluation Study of Electricity Interconnection of Turkey with Balkan Pool and UCTE,
Steady-State and Transient Stability Analysis,
Power and Energy Balance
for: European Union
type: study
finishing date: 2001 |
|
|
Back to Top |
|
|
|
Report of Ad Hoc Working Group "Interface Supervision",
Load-flow calculation
for: Technical committee UCTE/RO/BG
type: study
finishing date: 2001 |
|
|
Back to Top |
|
|
|
Feasibility and Evaluation Study of Upgrading at 400kV of the Existing 150kV Interconnection Line Amynteo-Bitola Steady-State and Transient Stability Analysis and Upgrading at 400 kV of the Existing 150 kV Electricity Interconnection Greece - ex Yugoslavia, part A:
for: EU, ESM, PPC, NEK
type: study
finishing date: 1998 |
|
|
Back to Top |
|
|
|
Feasibility and Evaluation Study of a New Interconnection Line Filippi - Plovdiv or Filippi - Maritsa East 3 Steady-State and Transient Stability Analysis, New Interconnection Greece - Bulgaria, Part A:
for: EU, ESM, PPC, NEK
type: study
finishing date: 1998 |
|
|
Back to Top |
|
|
|
Reactive Power Compensation in the Area of ZDP Elektrokrajina Banja Luka
for: Elektrokrajina
type: study
finishing date: 1998 |
|
|
Back to Top |
|
|
|
Reconnection of the UCPTE Network and Parallel Operation of the Bulgarian and Romanian Networks With UCPTE
for: SUDEL
type: study
finishing date: 1996 |
|
|