Connection of New CCHP Skopje to Transmission Grid of Macedonia

FRY of Macedonia
Connection of New CCHP Skopje to Transmission Grid of Macedonia

client: GAMA/ ALSTOM

type: Internal Study (Transmission, Generation)

finishing date: September 2007

team: Consortium MEPSO - EKC; EKC team: P. Miksa

Objective of this study is connection of the new production unit in CCHP Skopje to the transmission grid. This installation has large importance for Macedonia, since it first cogeneration plant of this type. It will have large importance both in electric energy sector but also for modernization of local district heating system, and from environmental point of view too. Different variants and solutions were evaluated in order to develop feasible techno economical solution.

Type of services provided:

  • Load flow and Voltage profile analyses
  • Fault analyses, switching analyses
  • Dynamic model building
  • Transient stability analyses