Consultancy Services for Electrical Network Study in Northern Emirates - FEWA

United Arab Emirates
Consultancy Services for Electrical Network Study in Northern Emirates - FEWA

client: EDF CIST (France), FEWA (UAE)

type: Master plan and Development plan study – pre-feasibility study

finishing date: December 2016

team: EDF CIST (France) - EKC (as sub-contractor); EKC team: Predrag Miksa – Team Leader, M. Stojanovic, M. Markovic

Goal of the project is to analyze transmission and distribution network in Northern Emirates – FEWA and propose network reinforcements to support secure and stabile network operation until 2035, including connection of two 2000MW power plants: TPP Mina Saqr and CCGT Umm Al Quwain.

Type of services provided:

  • Development plan and Master plan analyses,
  • Load flow and Voltage profile analyses,
  • Short circuit analyses,
  • Static security analyses,
  • Reactive power compensation,
  • Dynamic modeling and analyses