Reconnection of a Reconstructed Tracking Station Trebješica to Transmission Network

Montenegro
Reconnection of a Reconstructed Tracking Station Trebješica to Transmission Network

client: CGES ad (Montenegro)

type: Study (Transmission)

finishing date: July 2016

team: Milan Ivanovic – Team Leader, S. Markovic and M. Vukovic - Consultants, B. Sijakovic

Examine the impact of the reconstruction of the electric traction substation Trebješica to the power system of Montenegro. Traction substation is currently powered over "T" connection of 110 kV lines to SS Podgorica 1 and SS Andrijevica.

This temporary solution was applied during 2015, due to unavailability of the equipment within traction substation Trebješica (owned by the Railways of Montenegro). After complete reconstruction of the traction substation Trebješica, two line bays will be available, in order to enable its regular powering. Also the transformation power has been increased.

Type of services provided:

  • Load flow analyses
  • Network security assessment
  • Analyses of losses
  • Analyses of voltage-reactive conditions
  • Short circuit analyses