Technical Solution for Connecting Switchyard 20/35kV Sastavci to 35kV Distribution Network

Bosnia and Herzegovina
Study Sastavci Distribution Hydroenergy

client: Hydroenergy Gacko (B&H)

type: Study Case  (Transmission, Generation)

finishing date: June 2014

team: Maja Markovic - Project Manager, M. Vukovic - Consultant

Subject of the Study is to analyze the possibilities for the connection of new generating capacity to the distribution network of MH ERS ZP "Elektro-Hercegovina" a.d. Trebinje, in order to determine the terms and place of point of common coupling, operation parameters for small power plants, "internal 20kV network" and 35kV connection to the distribution network, in terms of security of delivery 9.6MW into B&H power system.

Type of services provided:

  • Load flow, power losses, voltage profile and short-circuit analysis
  • Safe operation analysis