Addition to Grid Connection Study of HPP Janjici to Power System of Bosnia and Herzegovina

Bosnia and Herzegovina
Addition to Grid Connection Study of HPP Janjici to Power System of Bosnia and Herzegovina

Client: Elektroprivreda B&H (B&H)

Type: Report

Finishing date: March 2022

Team: Milan Stojanovic – Project Manager, M. Vukovic - Consultant

In the past period, a Grid Connection Study of HPP Janjici has been completed. There was a requirement that the Grid Study should be updated with Fault Ride Through (FRT) analysis based on newly defined criteria (FRT curve). The Addition to Grid Study provides FRT analysis results based on newly defined criteria. FRT analysis was conducted for planned year of power plant commissioning and several operational scenarios of Bosnian power system.

Type of services provided:

  • Fault Ride Through analysis