Study Highway CGES

client: CGES (Montenegro)

type: Study Case  (Transmission)

finishing date: April 2014

team: Maja Markovic - Project Manager, M. Vukovic - Consultant

Subject of the Study is to analyze the solutions that are given and to propose optional solutions for connecting the substations for powering the highway infrastructure, on the Smokovac-Mateševo section of the highway, in terms of safe and reliable delivery of electric power and energy through the transmission network, taking into account the development plan of the transmission network of Montenegro, spatial plans, as well as techno-economic criteria.

Type of services provided:

  • Load flow, power losses, voltage profile and short-circuit analysis
  • Safe operation analysis
  • Techno-economical analysis