Connection of the new TPP Nikola Tesla B3 to the EPS of Serbia

Serbia
Connection of the new TPP Nikola Tesla B3 to the EPS of Serbia

client: RWE (Germany)

type: Project Analysis (Transmission, Generation)

finishing date: March 2010

team: Zoran Vujasinovic – Project Leader, M. Vukovic and S. Mijailovic - Consultants, T. Martinovic, M. Cokorilo, A. Oros, N. Jovic - control

The aim of the study is to thoroughly examine the possibility of connecting new TPP Nikola Tesla B3, to the 400 kV transmission network of Serbia, considering the state of 400, 220 and 110 kV network in future period in year 2016 and to provide the best possible solution for its connection, as well as to check distribution possibilities of electric power from TPP Nikola Tesla to neighboring EPSs for different scenarios, through the TTC/NTC calculation.

Type of services provided:

  • Data collection (historical, perspective, load/generation/topology, NTC status)
  • Review of Ancillary Services in Serbia and SEE
  • Generation expansion plans/demand forecast and surplus capabilities
  • Load flow, security (n-1), (2016)
  • TTC/NTC calculation (2016)
  • Conclusions