Remedial Actions for Voltage Control in SS Lastva

Montenegro
Remedial Actions for Voltage Control in SS Lastva

Client: CGES AD (Montenegro)

Type: Analysis

Finishing date: May 2020

Team: Nebojsa Jovic - Project Manager, M. Vukovic - Consultant, B. Lutovac

The objective of this analysis is identification of operational measures to resolve issues with high voltages in SS Lastva before planned installation of variable shunt reactor. The analysis comprises all available remedial actions that can be used by CGES to reduce the voltages in SS Lastva, such as modifying topologies (line disconnection or tap changes of the power transformers) as well as possibilities to engage PHPP Čapljina.

The results are used to prepare a joint operational procedure of CGES and NOSBIH to resolve high voltage issues.

Type of services provided:

  • Power flow analysis
  • Voltage profile analysis
  • Security assessment
  • Identification of remedial actions for voltage control and reactive power management