Small Signal Stability Analyses for Barakah Nuclear Power Plant (BNPP) – Unit 3

United Arab Emirates
Small Signal Stability Analyses for Barakah Nuclear Power Plant (BNPP) – Unit 3

Client: Mott MacDonald (UAE), TRANSCO (UAE)

Type: Report

Finishing date: January 2023

Team: Predrag Miksa - Project Team Leader, N. Jovic

The fourth study of small signal stability phenomena on BNPP. First one was performed before BNPP units were commissioned and main goal was to analyze influence of BNPP on the small signal stability issue and vice versa, by analyzing proposed controller parameters. Now, when third unit is in commissioning phase, there is need to analyze parameters of control systems that are built (AS BUILT analyses) and to justify or propose better parameter set for control devices in BNPP.

Type of services provided:

  • Dynamic modeling
  • Dynamic stability analyses
  • Small Signal Stability Analyses
  • PSS parameter settings