Study of Grid Connection of WPP Krivaca (103MW) to the Serbia Transmission System

Serbia
Study of Grid Connection of WPP Krivaca (103MW) to the Serbia Transmission System

Client: Acciona Energia Global S.L. (Spain)

Type: Study

Finishing date: July 2021

Team: Nebojsa Jovic - Project Manager, M. Ivanovic, L. Mladjenovic

The project aims to perform grid interconnection and power evacuation study for WPP Krivaca (103MW) considering the updated transmission development scenarios as well as generation and demand development plans in the region of interest.

The study includes the following analyses:

Steady-state Analysis:

  • Definition and modelling of cases that include the expansion plan of the grid under study
  • Power flow studies for normal operation
  • Power flow studies for N-1 operation
  • Assessment of voltage profiles

Short-circuit Analysis:

  • Short circuit power (SCC [MVA]) calculation under high and low demand scenarios.

Type of services provided:

  • Data collection
  • Grid modelling
  • Power flow analysis
  • Voltage profile analysis
  • Contingency analysis
  • Short-circuit analysis