Western Serbia – 400kV Transmission System Upgrade – IPF WB Energy – Serbia – TA-SER-26

Serbia
Western Serbia – 400kV Transmission System Upgrade

client: WYG International (United Kingdom), EMS (Serbia)

type: Pre-feasibility Study (Transmission)

finishing date: March 2010

team: Predrag Miksa – Тransmission Еngineer, Slobodan Markovic – System Analyst

Currently, the transmission system in Western Serbia especially, has inadequate capacity and equipment is very old. This adversely affects both energy imports and regional transit capacity in the Serbian network. Reconstruction of this part of the network is necessary, and upgrade to 400kV voltage level is best solution. Object of this prefeasibility study is to investigate possible options to realize this system upgrade till 2015 with network development vision till 2025.

Type of services provided:

  • Data collection and analyses
  • Consumption analyses and forecast
  • Load flow analyses
  • Voltage profile and reactive power analyses
  • Economical appraisal
  • Network development and planning
  • Social aspects
  • Environmental aspects