References
Generation, Transmission, Market, Renewable
Black Sea Regional Transmission System Planning Project (BSTP) • Study: RES Integration using Flexible Alternating Current Transmission Systems (FACTS) in the BSTP Region • Improvement of the Regional Network Model
Client: USEA, USAID
Type: Project
Finishing date: December 2021
Team: Dragana Orlic - Project Manager, B. Lutovac, B. Lekovic, B. Brdjanin, M. Kostic
Generation, Transmission, Policies
Procedure for the Compliance Testing of Operation of Generation Objects
Client: CGES AD (Montenegro)
Type: Report
Finishing date: January 2022
Team: Boris Brdjanin – Project Manager, N. Jovic - Consultant
Software
Justification of derogation reasons according to Art 16.9 EU 2019/943 (MNCCmargin and LFthreshold)
Client: Austrian Power Grid (Austria)
Type: Software
Finishing date: October 2021
Team: Danka Veljkovic – Project Manager, B. Lekovic, B. Lutovac, B. Brdjanin
Generation, Transmission, Renewable
Technical Solution for Connection of Renewable Power Generating Units to the Transmission System of Montenegro
Client: EPCG (Montenegro)
Type: Report
Finishing date: January 2022 (April 2022)
Team: Bogdan Lutovac – Project Manager, M. Vukovic, S. Markovic – Consultants, B. Sijakovic, L. Mladjenovic
Software
Consulting Servicies and Support for the TNA Software and CGMES format
Client: Austria Power Grid APG (Austria)
Type: Software
Finishing date: December 2021 (May 2022)
Team: Boris Brdjanin – Project Manager, B. Lutovac
Transmission, Renewable, Power Quality
Georgia Energy Storage Strategy for Grid
Client: EDF CIST (France), European Investment Bank
Type: Study
Finishing date: December 2021
Team: EDF Cist and EKC as subcontractor; EKC: Milan Ivanovic - Task V Leader
Generation, Transmission, Renewable
Analysis of the possibility of Connecting WPP Morine to the Transmission System of Bosnia and Herzegovina, including the Determination of the maximum Power Capacity of WPP Morina
Client: EFT Group HE Ulog (B&H)
Type: Study
Finishind date: November 2021
Team: Slobodan Markovic – Project Manager, B. Sijakovic, L. Mladjenovic, Z. Velickovic, M. Vukovic
Transmission
Grid Connection Study of HPP Dabar (159MW)
Client: ZD IRCE a.d., MH Elektroprivrede Republike Srpske (Bosnia and Herzegovina)
Type: Study
Finishing date: November 2021
Team: Nikola Georgijevic – Project Manager, M. Ivanovic, M. Vukovic
Software
Non-costly Remedial Action Optimization and Presolve algorithm for the Flow-Based Capacity Calculation with TNA
Client: APG-Austrian Power Grid (Austria)
Type: Software
Finishing date: November 2021
Team: Danka Todorovic - Project Manager, D. Vlaisavljevic, N. Georgijevic, B. Lutovac, I. Aljancic
Transmission, Renewable
Assessment of Available System Capacities for Connection of Solar Power Plants in the Region of Leskovac, Bujanovac and Odzaci
Client: UGT Renewables LLC (USA)
Type: Analysis
Finishing date: November 2021
Team: Nebojsa Jovic - Project Manager, S. Mijailovic, L. Mladjenovic