References
Transmission, Market
Stock Taking: Regional Power Trade in Southern Caucasus - Phase II
client: World Bank
type: Study (Transmission, Market)
finishing date: September 2013
team: Zoran Vujasinovic - Project Leader, S. Mijailovic, M. Stojkovic, P. Miksa - Consultant
Market, Renewable, Policies
Analysis of technical, market and regulatory aspects and the position of »Hidroelektrane na Trebišnjici« regarding the construction of TS Plat
client: HE na Trebisnjici (Bosnia and Herzegovina)
type: Study (Market, Renewable, Policies)
finishing date: May 2013
team: Zoran Vujasinovic – Project Leader, M. Vukovic – Consultant, T. Martinovic
Power Quality
Impact of Electric Arc Furnance in “Zeljezara” Niksic to Power Quality in Transmission System
client: CGES (Montenegro)
type: Study (Power Quality)
finishing date: May 2013
team: Andrija Oros – Project Leader, T. Martinovic
Power Quality
Reactive Power Compensation Requirements for OETC with 400KV System in 2016
client: OETC (Oman), EDF Cist (France)
type: Pre-Feasibility study (Power Quality)
finishing date: May 2013 (December 2013)
team: EDF Cist (France) - EKC consortium; EKC team: Predrag Miksa – Task Leader, Milos Stojkovic – Transmission system expert
Market, Policies
Market valorization of the HVDC cable Montenegro-Italy from the position of the Montenegrin TSO CGES
client: CGES (Montenegro)
type: Study (Market, Policies)
finishing date: February 2013
team: Zoran Vujasinovic – Project Leader, D. Orlic, S. Markovic, T. Martinovic, D. Vlaisavljevic, M. Vukovic - Consultant
Transmission, Market
New 400 kV Interconnection of Slovenia – Benefit Analysis
client: ELES (Slovenia)
type: Study (Transmission, Market)
finishing date: February 2013
team: Zoran Vujasinovic – Project Leader, D. Orlic, S. Markovic, T. Martinovic, D. Vlaisavljevic, M. Vukovic - Consultant
Generation, Transmission, Renewable
Dynamic stability and power quality analyses for connection study of Wind Power Plant Bogdanci (36.8 MW) to the transmission network of Macedonia
client: MEPSO (Macedonia)
type: Study (Renewable, Transmission, Generation)
finishing date: February 2013
team: Nebojsa Jovic - Project leader, M. Vukovic - Consultant, M. Stojkovic, A. Oros
Transmission, Market
SEE Electric Power System Evolution with Market and Network Analysis 2011-2016
client: Terna Crna Gora (Montenegro)
type: Study (Transmission, Market)
finishing date: December 2012 (March 2014)
team: Tomo Martinovic – Project Leader, Dj. Dobrijevic, D. Orlic, M. Stojkovic, S. Markovic, A. Oros, Z. Vujasinovic – Consultant
Transmission
Networks of different voltage levels in parallel operation
client: CGES (Montenegro)
type: Study (Transmission)
finishing date: November 2012
team: Djordje Dobrijevic - Project Manager, А. Oros, B. Sijakovic
Transmission
Equipment check for the values of short circuit current in older facilities in EPS of Montenegro
client: CGES (Montenegro)
type: Study (Transmission)
finishing date: November 2012
team: Bosko Sijakovic - Project Leader, M. Vukovic - Consultant, Dj. Dobrijevic - Expert Commission