Generation, Transmission

Bosnia and Herzegovina
Study Sastavci Distribution Hydroenergy

Technical Solution for Connecting Switchyard 20/35kV Sastavci to 35kV Distribution Network

client: Hydroenergy Gacko (B&H)

type: Study Case  (Transmission, Generation)

finishing date: June 2014

team: Maja Markovic - Project Manager, M. Vukovic - Consultant

Software

ENTSO-E
ENTSO-E Common Grid Model Exchange Standard (CGMES)

Test Configurations’ Development for ENTSO-E Common Grid Model Exchange Standard (CGMES) – version CIM 2.4.13

client: ENTSO-E (Belgium)

type: Project (Software)

finishing date: June 2014 (November 2014)

team: Consortium EKC - Schneider Electric DMS; EKC team: Zoran Vujasinovic - Project Leader, B. Sijakovic

Market, Software

Southeast Europe
Market Coupling Simulator

Market Coupling Simulator for the South East European Region

client: Energy Community Secretariat (Austria)

type: Project  (Software, Market)

finishing date: June 2014

team: Zoran Vujasinovic – Project Leader, D. Vlaisavljevic, B. Sijakovic, M. Vukovic – Consultant, DMS Group (subcontractor)

Generation, Transmission, Renewable

Bosnia and Herzegovina
Study WF Debelo Brdo Koncig

Connection Study of Wind Power Plant Debelo Brdo (54 MW) to the Transmission Network of B&H

client: Koncig Posušje (B&H)

type: Study  (Renewable, Transmission, Generation)

finishing date: May 2014

team: Nebojsa Jovic - Project Leader, M. Vukovic - Consultant, M. Stojkovic, A. Oros

Transmission

Montenegro
Study Highway CGES

Connection of the Highway Bar-Boljare, Smokovac-Mateševo Section, on the Transmission Network of Montenegro

client: CGES (Montenegro)

type: Study Case  (Transmission)

finishing date: April 2014

team: Maja Markovic - Project Manager, M. Vukovic - Consultant

Transmission, Power Quality

Bosnia and Herzegovina
Study RS Silicon

Study for Technical Solution for Connection of Submerged Arc Furnace to B&H Transmission Grid

client: RS Silicon (Bosnia and Herzegovina)

type: Study (Transmission, Power Quality)

finishing date: March 2014

team: Milos Stojkovic – Project Manager, N. Rusanov  and M. Vukovic – Consultants, A. Oros, S. Markovic

Transmission, Policies

FRY of Macedonia
Study Defence Plan MEPSO

Defence Plan of Power System of Macedonia

client: AD MEPSO (Macedonia)
type: Operational Planning Study
finishing date: March 2014
team: Nebojsa Jovic - Project Leader, M. Vukovic - Consultant, T. Martinovic, B. Sijakovic

Transmission

United Arab Emirates and Oman
Low Frequency Oscillatory Phenomenon

Consultancy Services into Low Frequency Oscillatory Phenomenon

client: Mott MacDonald (United Kingdom), TRANSCO (UAE)

type: Operational Prefeasibility Study (Transmission)

finishing date: September 2014

team: Mott MacDonald (United Kingdom) - EKC; EKC team: Predrag Miksa – Task Leader, N. Jovic – Transmission system expert, A. Oros – Transmission system expert

Generation, Transmission, Renewable

FRY of Macedonia
Study WF Inval MEPSO

Dynamic Stability and Power Quality Analyses for Connection Study of Wind Power Plant Inval (28 MW) to the Transmission Network of Macedonia

client: AD MEPSO (Macedonia)

type: Study  (Renewable, Transmission, Generation)

finishing date: December 2013

team: Nebojsa Jovic - Project Leader, M. Vukovic - Consultant, M. Stojkovic

Transmission, Market

Montenegro
Study System of Measurement EPCG

Estimation of Potential Benefits of the Project of Improvement the System of Measurement in EPCG

client: EPCG ad Niksic (Montenegro)

type: Study Case (Transmission, Market)

finishing date: December 2013

team: Maja Markovic - Project Manager; M. Vukovic - Consultant