References

Transmission

Montenegro
Networks of different voltage levels in parallel operation

Networks of different voltage levels in parallel operation

client: CGES (Montenegro)

type: Study (Transmission)

finishing date: November 2012

team: Djordje Dobrijevic - Project Manager, А. Oros, B. Sijakovic

Transmission

Montenegro
Equipment check for the values of short circuit current in older facilities in EPS of Montenegro

Equipment check for the values of short circuit current in older facilities in EPS of Montenegro

client: CGES (Montenegro)

type: Study (Transmission)

finishing date: November 2012

team: Bosko Sijakovic - Project Leader, M. Vukovic - Consultant, Dj. Dobrijevic - Expert Commission

Transmission, Market

Black Sea Region
Black Sea Regional Transmission System planning project - Phase III

Black Sea Regional Transmission System planning project - phase III; Economic model development and electricity market and RES evaluation, Regional model 2015 and 2020 update

client: USEA, Black Sea Transmission Project

type: Study (Transmission, Market)

finishing date: November 2011 (November 2012)

team: consortium Black Sea WG - EKC; EKC team: P. Miksa – Task Leader, N. Jovic – Network analyst, T. Martinovic – Network analyst, Z. Vujasinovic, M. Vukovic – Consultant

Transmission, Market

Albania and Montenegro
Impact of RES power plants generation inflow on SEE transmission grids and their capabilities to export generation to Montenegro and Italy

Impact of RES power plants generation inflow on SEE transmission grids and their capabilities to export generation to Montenegro and Italy - Scenarios 2016 and 2020

client: Terna Crna Gora (Montenegro)

type: Network Study (Transmission, Market)

finishing date: September 2012

team: Tomo Martinovic – Project Leader, Z. Vujasinovic, S. Markovic, M. Vukovic – Consultant

Generation, Transmission, Renewable

Serbia
Study of Technical Solution for Connection of Wind Farm "Plandište 1“ to the Transmission System of Serbia

Study of Technical Solution for Connection of Wind Farm "Plandište 1“ to the Transmission System of Serbia

client: WP Plandište (Serbia)

type: Study (Renewable, Transmission, Generation)

finishing date: September 2012

team: Dragana Orlic - Project Manager, N. Krajisnik, M. Stojkovic, N. Jovic - Consultant

Generation, Transmission

Southeast Europe
Construction and Verification of Model for Dynamic Analyses

Construction and Verification of Model for Dynamic Analyses

client: USEA, (SEE TSOs)

type: Study (Transmission, Generation)

finishing date: September 2012 (November 2012)

team: Djordje Dobrijevic - Project Manager, N. Krajisnik, M. Stojkovic, P. Miksa

Power Quality

FRY of Macedonia
Power Quality

Specification of Power Quality Performance of the Transmission Network in the Republic of Macedonia and Recommendations for Optimal Investments for Improving the Power Quality as well as Voltage Conditions in the Power Transmission Network in Macedonia

client: AD MEPSO (Macedonia)

type: Study (Power Quality)

finishing date: September 2012

team: Prof. Dr. Jovica V. Milanovic - Project Manager, Principal Consultant; A. Oros, T. Martinovic, P. Miksa, Z. Velickovic, M. Vukovic - Consultant

Software

Montenegro
Software for Network Analyses and Transmission Capacity Calculations – TNA CGES

Software for Network Analyses and Transmission Capacity Calculations – TNA CGES

client: CGES (Montenegro)

type: Software License (Software)

finishing date: September 2012

team: Zoran Vujasinovic – Project Leader, N. Jovic, B. Sijakovic

Transmission

Armenia
Development of Reliability Indicators for the Armenian Power System Operation

Development of Reliability Indicators for the Armenian Power System Operation

client: Scientific Research Institute of Energy – SRIE (Armenia)

type: Study (Transmission)

finishing date: September 2012

team: consortium SRIE - ENTEC - EKC; EKC team: Predrag Miksa - Task Leader, T. Martinovic

Transmission

Montenegro
Alternative Solution for the New Interconnection Montenegro – Bosnia and Herzegovina

Alternative Solution for the New Interconnection Montenegro – Bosnia and Herzegovina

client: CGES (Montenegro)

type: Pre-feasibility Study (Transmission)

finishing date: Phase 1: July 2012; Phase 2: September 2013

team:

Phase 1: N. Krajisnik- Project Leader, A. Oros, M. Vukovic and S. Markovic – Consultants

Phase 2: S. Marković - Project Leader, B. Sijaković, M. Vukovic – Consultan

Pages