References
Transmission, Market, Power Quality
Feasibility study for new under sea HVDC interconnection between Italy and Montenegro
client: EBRD, Terna (Italy), EPCG (Montenegro)
type: Regional Study (Transmission, Power Quality, Market)
finishing date: a) March 2008; b) July 2008
team:
a) M.Vukovic, S. Mijailovic, P. Miksa, Z. Vujasinovic, S. Markovic, T. Martinovic, N. Jovic
b) M.Vukovic, S. Agarwal, M. Papic, Dj. Dobrijevic, P. Miksa, N. Krajisnik, S. Markovic, T.Martinovic, N. Jovic
Transmission, Software
PSA_maxFlow: Software for processing of the technical data, (network models, PTDF matrices and transmission capacities), within the 2008 - DRY-RUN implementation of Coordinated Auctions in SEE region
client: USAID (United States Agency for International Development) and SEE TSOs (SETSO NACMPF SG)
type: Project (Software, Transmission)
finishing date: February 2009
team: Snezana Mijailovic – Contract Manager, Z. Vujasinovic – Technical Manager, M. Vukovic, B. Ivanovic (EMS), N. Jovic, Dj. Dobrijevic
Transmission
Operational Network studies - OMAN Interconnection (phase IV and V)
client: TRANSCO (UAE), OETC (Oman), EDF Cist (France)
type: Regional Study (Transmission)
finishing date: July 2008
team: EDF Cist (France)- EKC; EKC team: P. Rousse (EDF) – Project Leader, P. Mikša, K. Naumovski (MEPSO)
Transmission
CARTRANS – Central Asia Regional Transmission System planning project - Regional model development
client: USEA, USAID
type: Regional Study (Transmission)
finishing date: September 2008
team: S. Mijailovic, N. Krajisnik, P. Miksa
Generation, Transmission
Мodel Development for Dynamic Analyses of Power System of Serbia
client: EMS (Serbia)
type: Internal Study (Transmission, Generation)
finishing date: September 2008 (January 2009)
team: Consortium EINT Electrotechnical Institute "Nikola Tesla" - EKC; EKC team: Dj. Dobrijevic, N. Krajisnik, T. Martinovic
Generation, Transmission
Model Development for Dynamic Analyses of Power System of Macedonia
client: AD MEPSO (Macedonia)
type: Internal Study (Transmission, Generation)
finishing date: June 2008
team: P. Miksa, N. Krajisnik, T.Martinovic
Transmission, Policies
Feasibility Study: Synchronous Interconnection of the Power Systems of IPS/UPS with UCTE
client: E.ON Netz GmbH (Germany), UCTE, EPC CIS, IPS/UPS
type: Regional Study (Transmission, Policies)
finishing date: 2008
team: The UCTE-Consortium responsible for the project consists of 11 TSOs from 9 countries, on IPS/UPS-side a group of 7 companies have established a joint agreement for the project; EKC team: M. Vukovic, S. Mijailovic, P. Miksa, Dj. Dobrijevic, Z. Vujasinovic, V. Nesic, B. Radovic
Transmission
Review of Electricity Supply, Demand and Transmission Projections in South-East Europe in the Period 2008-2020
client: ČEZ (Czech Republic)
type: Regional Study (Transmission)
finishing date: July 2008
team: M. Vukovic, S. Mijailovic, Z. Vujasinovic, T. Martinovic, D. Harambasic, N. Jovic, M. Mandic
Generation, Transmission
Connection of the TPP Stanari (420MVA) to the EPS of Bosnia and Herzegovina
client: EFT Rudnik and TPP Stanari (Bosnia and Herzegovina)
type: Internal Study (Transmission, Generation)
finishing date: July 2008
team: M. Vukovic – Project Leader, Dj. Dobrijevic, S. Markovic, N. Krajisnik
Generation, Transmission
Impact of new generation by SECI Energia’s hydro power plants on transmission networks of Srpska Republic of BiH and neighboring South-East Europe countries - Security analyses and needed grid reinforcements -
client: TERNA (Italy)
type: Study (Transmission, Generation)
finishing date: June 2008
team: Dj. Dobrijevic – Project Leader, M. Vukovic - Consultant, S. Markovic, T. Martinovic