References
Transmission
Uncertainties in the SEE Transmission Network and Evaluation of Risk for Future Infrastructure Investments
client: USAID, USEA, SEE TSOs
type: Study (Transmission)
finishing date: December 2009
team: consortium EKC - EIHP (Croatia); EKC team: Dj. Dobrijevic - Project Leader, N. Jovic, T. Martinovic, A. Oros
Generation, Transmission
Black Sea Regional Transmission System Planning Project - Phase II, Dynamic Model Development and Stability Evaluation, Regional Model 2015 and 2010 Update
client: USEA, USAID
type: Regional Study (Transmission, Generation)
finishing date: October 2010
team: S. Mijailovic, P. Miksa, N. Jovic
Transmission
Feasibility Study of the new 400 kV OHL Serbia – Romania
client: MVV-Decon (Germany)
type: Study (Transmission)
finishing date: August 2009
team: Dj. Dobrijevic, M. Vukovic, N. Jovic, Z. Vujasinovic, T. Martinovic, A. Oros, M. Cokorilo
Generation, Transmission
Connection of the Block 7 TPP Tuzla (450MW) to the EPS of Bosnia and Herzegovina
client: Esotech (Slovenia), Electric Power Utility BiH (Bosnia and Herzegovina)
type: Feasibility Study (Transmission, Generation)
finishing date: July 2009 (updated April 2012)
team: Slobodan Markovic - Project Leader Static analyses, Dj. Dobrijevic - Project Leader Dynamic analyses, M. Vukovic - Consultant, P. Miksa, T. Martinovic, A. Oros, M. Cokorilo
Transmission
EMAL Interconnection Network Studies
client: EDF Cist (France), TRANSCO (UAE)
type: Feasibility Study (Transmission)
finishing date: September 2009
team: EDF Cist - EKC; EKC team: P. Miksa, S. Markovic
Generation, Transmission
Analysis of Albanian Grid and Export Potential
client: RWE (Germany)
type: Study (Transmission, Generation)
finishing date: June 2009
team: Snezana Mijailovic - Project Leader, M. Vukovic – Consultant, Z. Vujasinovic, T. Martinovic, S. Markovic, P. Miksa, N. Jovic, M. Cokorilo
Transmission
IPF for Western Balkans – Energy Montenegro – Electricity Network Development Project
client: WYG International (United Kingdom), Prenos a.d. (Montenegro)
type: Project (Transmission)
finishing date: June 2009
team: Predrag Miksa – Тeam Leader, S. Markovic, S. Maksimovic
Generation, Transmission
Prefeasibility Study of Connection of the TPP Banovici (300MW) to the EPS of Bosnia and Herzegovina
client: IBE (Slovenia), Electric Power Utility BiH (Bosnia and Herzegovina)
type: Pre-feasibility Study (Transmission, Generation)
finishing date: March 2009
team: Slobodan Markovic – Project Leader, M. Vukovic, P. Miksa – Consultants, N. Jovic
Generation, Transmission
Connection of the Block 8 TPP Kakanj (300MW) to the EPS of Bosnia and Herzegovina
client: IBE Ljubljana (Slovenia), Electric Power Utility B&H (Bosnia and Herzegovina)
type: Feasibility Study (Transmission, Generation)
finishing date: May 2009
team: Slobodan Markovic - Project Leader Static analyses, Dj. Dobrijevic - Project Leader Dynamic analyses, M. Vukovic - Consultant, P. Miksa, T. Martinovic, A. Oros, M. Cokorilo
Transmission, Market
Generation surplus projections in Eastern Europe (EE) region and electricity market scenarios in the period 2008 – 2020 [Updated data and scenarios]
client: TERNA (Italy)
type: Study (Transmission, Market)
finishing date: April 2009
team: Zoran Vujasinovic – Project Leader, M. Vukovic, S. Mijailovic, A. Kovacevic (Consultants), S. Markovic, N. Jovic, T. Martinovic, A. Oros, M. Cokorilo