References

Transmission, Software

Central East Europe
Technical Parameters Calculation “TPC tool” – software for PTDF/MF

CAO - Freising - IT system for coordinated flow based allocation and related services; EKC: Technical Parameters Calculation “TPC tool” – software for PTDF/MF

client: Riecado (Siemens/CEE CAO Freising, Munich, Germany)

type: Project Software (Software, Transmission)

finishing date: Main: April 2009; Change Requests: May 2012

team: Consortium DMS Novi Sad - EKC; EKC team: Zoran Vujasinovic – Project Leader, Dj. Dobrijevic, N. Jovic, S. Mijailovic and M. Vukovic - Consultants

Generation, Transmission

Serbia
Prefeasibility Study of Connection of the TPP Dragačevo to the EPS of Serbia

Prefeasibility Study of Connection of the TPP Dragačevo to the EPS of Serbia

client: Mineral Investments (Serbia)

type: Pre-feasibility Study (Transmission, Generation)

finishing date: November 2008

team: Slobodan Markovic – Project Leader, M. Vukovic - Consultant, N. Jovic

Transmission, Market, Power Quality

Southeast Europe and Italy
Feasibility study for new under sea HVDC interconnection between Italy and Montenegro

Feasibility study for new under sea HVDC interconnection between Italy and Montenegro

client: EBRD, Terna (Italy), EPCG (Montenegro)

type: Regional Study (Transmission, Power Quality, Market)

finishing date: a) March 2008; b) July 2008

team:

a) M.Vukovic, S. Mijailovic, P. Miksa, Z. Vujasinovic, S. Markovic, T. Martinovic, N. Jovic
b) M.Vukovic, S. Agarwal, M. Papic, Dj. Dobrijevic, P. Miksa, N. Krajisnik, S. Markovic, T.Martinovic, N. Jovic

Transmission, Software

Southeast Europe and Italy
PSA_maxFlow: Software for processing of the technical data, (network models, PTDF matrices and transmission capacities), within the 2008 - DRY-RUN implementation of Coordinated Auctions in SEE region

PSA_maxFlow: Software for processing of the technical data, (network models, PTDF matrices and transmission capacities), within the 2008 - DRY-RUN implementation of Coordinated Auctions in SEE region

client: USAID (United States Agency for International Development) and SEE TSOs (SETSO NACMPF SG)

type: Project (Software, Transmission)

finishing date: February 2009

team: Snezana Mijailovic – Contract Manager, Z. Vujasinovic – Technical Manager, M. Vukovic, B. Ivanovic (EMS), N. Jovic, Dj. Dobrijevic

Transmission

United Arab Emirates and Oman
Operational Network studies - OMAN Interconnection

Operational Network studies - OMAN Interconnection (phase IV and V)

client: TRANSCO (UAE), OETC (Oman), EDF Cist (France)

type: Regional Study (Transmission)

finishing date: July 2008

team: EDF Cist (France)- EKC; EKC team: P. Rousse (EDF) – Project Leader, P. Mikša, K. Naumovski (MEPSO)

Transmission

Central Asia
CARTRANS – Central Asia Regional Transmission System planning project - Regional model development

CARTRANS – Central Asia Regional Transmission System planning project - Regional model development

client: USEA, USAID

type: Regional Study (Transmission)

finishing date: September 2008

team: S. Mijailovic, N. Krajisnik, P. Miksa

Generation, Transmission

Serbia
Мodel development for dynamic analyses of power system of Serbia

Мodel Development for Dynamic Analyses of Power System of Serbia

client: EMS (Serbia)

type: Internal Study (Transmission, Generation)

finishing date: September 2008 (January 2009)

team: Consortium EINT Electrotechnical Institute "Nikola Tesla" - EKC; EKC team: Dj. Dobrijevic, N. Krajisnik, T. Martinovic

Generation, Transmission

FRY of Macedonia
Model development for dynamic analyses of power system of Macedonia

Model Development for Dynamic Analyses of Power System of Macedonia

client: AD MEPSO (Macedonia)

type: Internal Study (Transmission, Generation)

finishing date: June 2008

team: P. Miksa, N. Krajisnik, T.Martinovic

Transmission, Policies

ENTSO-E
Synchronous Interconnection of the Power Systems of IPS/UPS with UCTE

Feasibility Study: Synchronous Interconnection of the Power Systems of IPS/UPS with UCTE

client: E.ON Netz GmbH (Germany), UCTE, EPC CIS, IPS/UPS

type: Regional Study (Transmission, Policies)

finishing date: 2008

team: The UCTE-Consortium responsible for the project consists of 11 TSOs from 9 countries,  on IPS/UPS-side a group of 7 companies have established a joint agreement for the project; EKC team: M. Vukovic, S. Mijailovic, P. Miksa, Dj. Dobrijevic, Z. Vujasinovic, V. Nesic, B. Radovic

Transmission

Southeast Europe
Review of electricity supply, demand and transmission projections in South-East Europe in the period 2008-2020

Review of Electricity Supply, Demand and Transmission Projections in South-East Europe in the Period 2008-2020

client: ČEZ (Czech Republic)

type: Regional Study (Transmission)

finishing date: July 2008

team: M. Vukovic, S. Mijailovic, Z. Vujasinovic, T. Martinovic, D. Harambasic, N. Jovic, M. Mandic